Chalon-sur-Saône General Hospital
Brunet and Saunier Architecture, SIRR Engineering, Terrell International
Designed to replace the old hospital in Chalon-sur-Saône and increase its patient care capacity, the new William Morey Hospital covers a 7-hectare site, featuring a 73,000 m² Medicine, Surgery and Obstetrics building with a capacity of 540 beds. The hospital features, amongst other things, eight operating theatres, 24 intensive care beds, laboratories, an A&E department and a helipad. The project also includes landscaping of the surrounding area and the construction of a 1,000-space car park.
For this project, setec opency carried out the following tasks: Project Management (OPC) for design and construction, and management of shared site expenditure.
Project cost : €155 million
Construction period : 2007–2011