The project aims to rebuild one of the Air Liquide Group’s research centres in Les Loges-en-Josas. The works will bring together all the Centre’s functions within a single building: a reception area, laboratories, a research and development centre, and a Fab Lab comprising workshops. The building is a two-storey structure plus ground floor, covering 14,000 m², with its various sections extending horizontally along a central axis. The project comprises six stages, including the construction of a temporary canteen, the rerouting of utility networks and demolition work, the construction of the building itself, and the landscaping.
For this project, setec opency carried out the following tasks: project management for design and construction.
Project cost : €40 million
Construction period : 2015–2018