en
SPL Ametarra
2027
In 2018, the CAPA (Communauté d’Agglomération du Pays Ajaccien) initiated the redevelopment of the military site located in Ajaccio.
Originally built in the 1930s for refueling warships in case of a failure at the Toulon port, the site is now being repurposed with a threefold objective:
setec opency has been assigned a consultancy role in Scheduling, Construction Management and Coordination (SCMC) and IC (Integrated Coordination) under the direction of MUTATIS. Their task involves analyzing production to advise on managing operational constraints, including site facilities, stock management, operational interfaces, and strategic consulting.