This challenge was met by Quentin Guyon, who, in addition to the SCMC mission, deployed our Lean Site tools (collaborative geo-temporal planning, the Last Planner System, inventory management and steering indicators), thus facilitating exchanges between the various players, reducing waste on the site and optimizing construction deadlines.
photo credits : setec opency