Welcome to the setec opency Newsroom, your source of information on our projects, assignments, and areas of expertise. Check back regularly to follow the progress of our operations, discover our innovations, and gain insight into the challenges shaping the future of consulting and engineering.
In the news
OPENING OF SPA LA ROTONDE – OPC MISSION COMPLETED AT LES GRANDS BAINS DU MONÊTIER
10 YEARS OF COMMITMENT AT THE HEART OF THE LYON PART-DIEU MULTIMODAL HUB: SETEC OPENCY’S CONTRIBUTION TO A MAJOR URBAN PROJECT
VISIT TO SYTRAL MOBILITES’ TRAMWAY CONTROL CENTER: SETEC ALONGSIDE OPERATIONS TEAMS TO PRESENT ITS ROLE AS PROJECT COORDINATOR (OPC)
Filter by :
80News
News
19/12/2024
MASTERING DEADLINES ON THE RESTORATION SITE OF NOTRE-DAME DE PARIS
See
News
28/11/2024
Notre-Dame de Paris: Final Stretch Before Reopening!
See
News
25/11/2024
OUR GRAPHIC PRODUCTION UNIT
See
News
25/11/2024
Multi-Sports Facility and Its Surroundings – Python-Duvernois ZAC
See
News
06/11/2024
ARRIVAL OF THE FIRST TRAIN FOR LINES 16 AND 17 AT THE AULNAY OPERATIONS CENTER
See
News
28/10/2024
Open Days at the Lyon-Turin Railway Interconnection Construction Site
See
News
02/10/2024
SETEC OPENCY AT THE EUROPEAN HERITAGE DAYS 2024
See
News
27/08/2024
The Marengo Multimodal Transport Hub (PEM) Near Matabiau Station in Toulouse is Taking Shape!