en
SIG (Service Industriel de Genève)
2028
The Services Industriels of Geneva (SIG) have initiated a large-scale project at the Aïre Wastewater Treatment Plant (STEP).
Originally designed to treat carbon, nitrogen, and phosphorus pollution for a capacity of 600,000 inhabitants, the plant is now operating over capacity. It is currently overloaded with carbon pollution equivalent to 750,000 inhabitants. To address this, the plant is undergoing an expansion to meet the needs of 1 million inhabitants by 2050, focusing on increasing its biological treatment capacity.
For this project, SIG has engaged setec opency to provide expertise in Lean Management, including:
setec opency brings its project management methodologies and collaborative tools to unite all stakeholders around:
This mission aligns with the sectors that setec opency aims to further develop as part of its “Engineer & Citizen” initiative, as well as with the new focus areas identified for strengthening within the Stratency framework.
400 M€ de travaux