en
Etablissement Public du Musée du Louvres
2017
The Pyramide Project involves the reconfiguration of the Louvre Museum’s reception areas and enhancements to visitor mediation.
The restructuring includes:
The mediation component aims to enrich the visitor experience through:
More informations : Projet Pyramide
For this project, setec opency was responsible for Scheduling, Construction Management and Coordination (SCMC) during both the design and construction phases.
Coût du projet : 17 M€