SCMC mission to adapt several RATP bus centers to the operation of electric buses, as part of the “Bus 2025” program which should lead to the elimination of diesel buses by 2025 (Saint-Denis Pleyel, Malakoff, Vitry-sur-Seine, Asnières-sur-Seine).
OWNER: RATP
SCMC mission for the installation of a hydrogen station at Le Bourget.
Owner: HysetCo
Project management for the deployment of some twenty hydrogen stations in the Paris region, to be commissioned by the 2024 Olympic Games.
Owner: Hype Taxi
Lot number 1: General SCMC mission for work on lines 16 & 17 of the Grand Paris Express (from Saint-Denis Pleyel to Noisy-Champs)
Owner: Société du Grand Paris (SGP)
SCMC mission for the project to create a baggage sorting system for satellites S3 – S4 (T2E).
SCMC mission for the project to replace the footbridges in terminals 2A and 2D.
Pro-rata account management for the baggage sorting system project at satellite S4 (T2E).
Pro-rata management of the CDG 1 construction site (a boarding hall, a commercial area, lounges and a screening area).
Management of the eastern part of the site, housing the platform’s construction and maintenance companies.
Management of the prorata account for the CDG Express station site.
Owner: Aéroport de Paris (ADP)
SCMC mission for the operating center project for lines 16 & 17 of the Grand Paris Express, involving the creation of a maintenance and storage site (SMR), an infrastructure maintenance site (SMI) and a centralized command post (PCC).
Owner: Société du Grand Paris (SGP)
General SCMC mission and works for the extension of RATP line 14 (from Olympiades station to Aéroport d’Orly).
OWNER: RATP
Lot number 2 – General SCMC mission for work on line 15 south of the Grand Paris Express (from Pont de Sèvres to Noisy-Champs).
Owner: Société du Grand Paris (SGP)
SCMC mission for the renovation of parking lot P2 and the esplanade facing the arrival of the future metro line 14 station.
Management of the prorata account for the entire project to build the Grand Paris Express metro station, rebuild the P3 parking lot and create an esplanade in front of Orly 3.
Assistance to Leonardo for the redevelopment and renewal of baggage sorting equipment at the South Terminal.
Mission de gestion du Lotissement 6N de chantier accueillant les entreprises de travaux et maintenance de la plateforme.
Owner: Aéroport de Paris (ADP)
SCMC mission integrated within the project management team (setec TPI & Ingérop) for the line 15 – T3 works project from Pont de Sèvres to Villejuif Louis Aragon.
Owner: Société du Grand Paris (SGP)
SCMC mission for the construction of the new RER E station at La Défense under the CNIT, at a depth of more than 30m, in connection with the district and other transport lines.
Owner: SNCF Réseau
SCMC mission for the creation of a maintenance and storage site for RER E trains (EOLE) in Mantes-la-Jolie.
Owner: SNCF Réseau