The project involves the construction of a link building between Terminals 2B and 2D and the refurbishment of Terminal 2B at Paris-Charles-de-Gaulle Airport. In total, this represents 77,500 m² of built, refurbished and renovated space, 25,000 m² of new floor space created for the new link building, 50,000 m² of renovated floor space within Terminal 2B, and 2,500 m² for the extension of Terminal 2B. This refurbishment has thus made it possible to separate passenger departure and arrival flows. The BD connecting building, meanwhile, now houses security screening facilities, a baggage reclaim hall, retail areas and airline lounges.
For this project, setec opency carried out the following tasks: project management for design and construction, and client support.
Project cost : €280 million
Construction period : 2016–2021