‘On a building site, time isn’t wasted. It becomes disorganised.’

A construction site doesn’t fall behind overnight. It drags on, becomes strained, and loses its clarity. A task that runs over time, an area occupied for longer than planned, a decision that is delayed. Nothing spectacular. Yet, within a few weeks, the initial schedule becomes difficult to maintain.

In complex projects, this dynamic is amplified. Urban density, high levels of concurrent activity, stringent contractual requirements, multiple interfaces. The construction site no longer resembles an orderly sequence of tasks. It becomes an interdependent system, where every delay ripples through.

This observation holds true on a large scale. An analysis of 480 infrastructure projects worldwide shows that nearly 70 per cent of projects experience delays, with some falling well behind the initial schedule. These delays stem mainly from shortcomings in the management and monitoring of planning and coordination, rather than from technical difficulties.

It is against this backdrop that the OPC role has established itself as a key structural function. It does not simply involve drawing up a schedule. It involves making the project feasible and keeping it under control. At setec opency, this approach is based on a simple conviction: a project’s success depends first and foremost on its organisation.

But in practical terms:

  • What is the OPC’s actual role? 
  • How can an effective project be structured? 
  • Why does anticipating interfaces change the dynamics of a project? 

This article offers a practical insight into the OPC role, from its scope to its actual impact on project performance.

1. The OPC role: a key part of managing project complexity

2. Why OPC has become a strategic tool for project owners

3. How to structure an OPC project to ensure deadlines are met

4. A real-life example: Notre-Dame de Paris – when coordination makes all the difference

5. Why anticipating interfaces changes everything

Conclusion

For further

NEW PROJECT: OPC & LOGISTICS – OPERA GARNIER, PARIS

OPENING OF SPA LA ROTONDE – OPC MISSION COMPLETED AT LES GRANDS BAINS DU MONÊTIER

233 COURS LAFAYETTE IN LYON: 3 LESSONS FOR DELIVERING AN AMBITIOUS REUSE-DRIVEN PROJECT